This 20 year old Condo had original finishes, and was time for an update!!
The walls were gutted to the metal studs, reframed and all finishes were updated.
Aging-in-place function and ample storage were KEY in this design!
We gutted the step-in tub to a roll-in tiled shower and included wheelchair accessible vanity cabinetry.
Improved lighting, vinyl plank throughout and many storage areas, were included for safety in mind for Senior living.