Renovations

TD – Cedar Estates Project

This 20 year old Condo had original finishes, and was time for an update!!

The walls were gutted to the metal studs, reframed and all finishes were updated.

Aging-in-place function and ample storage were KEY in this design!

We gutted the step-in tub to a roll-in tiled shower and included wheelchair accessible vanity cabinetry.

Improved lighting, vinyl plank throughout and many storage areas, were included for safety in mind for Senior living.